Defining Our Problem
The details of this lesson can be found in the manual, starting on page 113.
Display Materials:
- Just-in-Time: Engineering Design Process graphic
- Alternate Design Process graphic
- Engineering Solutions – Stormwater Runoff video Length 3:25 – English closed captioning can be turned on and off in the video with the CC button.
Worksheets:
- Stakeholder Interview worksheet